Project Summary (October 2018 to March 2021)
The project is a David Reid Homes development, the architects are Respond Architects (Prendos Ltd) and we Constructure were the structural engineers.
The development comprises of 7 three-storey semi-detached residential units. The units were constructed from timber lightweight framing which incorporated some steel framing, lightweight external cladding, timber roof trusses and a Cupolex raft slab on grade (by others). Inter-tenancy walls are timber lightweight system.
There are essentially two types of Units, which we will refer to as single garage units and double garage units. There are to be 3 number single garage units and 4No. double garage units. The layout of each unit is similar across the development but, enough differences are present to require some
In conjunction with a chattered engineer I was responsible for the conceptual and structural design and building consent structural design, resolution of council RFIs during consent, and final construction monitoring.
The Concept
The Finished Product (almost)
This was this site at after the existing structures had been cleared out
Landscaping masonry wall footings , pre-pour inspection
Roof Structural Markups over 2nd floor
2nd Floor Structural Markups over First floor
These show the then proposed structural markups framing over the 1st floor, for Units 1 - 3